| 1. | To add lead or lag time 如果要添加前置重叠时间或延隔时间: |
| 2. | Use minute , hour , day , week , or month for the lead or lag time units 前置重叠时间或延隔时间的单位可以是分、小时、工作日、周或月。 |
| 3. | Note1 : up screen display power factor and down screen display voltage to be lead or lag 注1 :上屏显示功率因数,下屏显示电压超前或滞后。 |
| 4. | Closing or opening takes place without any feedback effect on the measuring system , precluding any signal lead or lag 开关不会对测量系统产生反馈,防止了信号的提前或延迟。 |
| 5. | You can express lead or lag time as units of time or as a percentage of the predecessor task ' s duration 可以使用时间单位或前置任务工期的百分比来表示前置重叠时间或延隔时间。 |
| 6. | In particular , you have been asked to find peak times for bike sales and to learn how sales lead or lag with regard to region 特别是,常常需要对自行车销售量的高峰期做出预测,并且需要了解旺销或滞销与区域的关系。 |
| 7. | After you enter tasks and assign dependencies to them , analyze your schedule and look for instances where you can apply lead or lag time 输入任务并指定相关性后,应分析日程并查找需要应用前置重叠时间和延隔时间的情况。 |
| 8. | If a task must start or finish on or near a specific date , just linking tasks and adding lead or lag time might not do the trick 如果任务必须在(或接近)特定日期开始或完成,则简单地链接任务和添加提前或推迟的日期可能无法达到目的。 |
| 9. | The laboratory can provide calibration for 50 or 60 hz single - phase power factor meters with measuring range from zero to unity , leading or lagging 功率因数表本所可为频率为50或60hz而测量量程由零至一超前或滞后的单相功率因数表提供校正服务。 |
| 10. | In most situations , you can schedule tasks to occur at the right time by listing them in logical order , linking them , and adding lead or lag time 大多数情况下,排定任务日程的步骤是:将任务按逻辑顺序排列,链接它们,然后添加提前或推迟的日期。 |